Toms 26 T project
#41
Senior Member
Thread Starter
Join Date: 01-13-2006
Location: Superior, WI - Over the Hill Warranty Club member
Posts: 2,999
It has been my full time job being in the unemployment Union from last March 31st.
I just don't like the setbacks like taking apart the tranny to rebuild it and finding it is broke in the low gear cluster, Got another TH350C trans yesterday, this one is from a truck with electric overdrive switch optional.
I just don't like the setbacks like taking apart the tranny to rebuild it and finding it is broke in the low gear cluster, Got another TH350C trans yesterday, this one is from a truck with electric overdrive switch optional.
#42
Senior Member
Thread Starter
Join Date: 01-13-2006
Location: Superior, WI - Over the Hill Warranty Club member
Posts: 2,999
Here are some Pics of what I started the project with.
Body
LS engine 5.3 after removing the fuel injection and installing the mods.
Start of the frame.
Body
LS engine 5.3 after removing the fuel injection and installing the mods.
Start of the frame.
#43
Senior Member
Thread Starter
Join Date: 01-13-2006
Location: Superior, WI - Over the Hill Warranty Club member
Posts: 2,999
90 degree brake set up in position, just needs the proper bolts (parts run time)
Exhaust in place
My custom design for a transmission rear mount is in place as is the driveline loop.
And the build continues
Exhaust in place
My custom design for a transmission rear mount is in place as is the driveline loop.
And the build continues
#44
Senior Member
Thread Starter
Join Date: 01-13-2006
Location: Superior, WI - Over the Hill Warranty Club member
Posts: 2,999
Todays updates.
Headlights installed.
Headers and rear shot of headlights
Setting up the drive loop. Note the trans is done and drive shaft is back in
Gas Tank is mounted and lines run
And a new how it looks
Headlights installed.
Headers and rear shot of headlights
Setting up the drive loop. Note the trans is done and drive shaft is back in
Gas Tank is mounted and lines run
And a new how it looks
#45
Senior Member
Thread Starter
Join Date: 01-13-2006
Location: Superior, WI - Over the Hill Warranty Club member
Posts: 2,999
Drive loop done and E-brake ready for final routing and bolt-up
#47
Senior Member
Thread Starter
Join Date: 01-13-2006
Location: Superior, WI - Over the Hill Warranty Club member
Posts: 2,999
Todays overall Pics working on running brake lines.
#48
#49
Senior Member
Thread Starter
Join Date: 01-13-2006
Location: Superior, WI - Over the Hill Warranty Club member
Posts: 2,999
Over the weekend I ran the brake lines
I can shift the Auto Tranny now
and Got Belted..... er put the new belt on the engine..
I can shift the Auto Tranny now
and Got Belted..... er put the new belt on the engine..
#50
Senior Member
Thread Starter
Join Date: 01-13-2006
Location: Superior, WI - Over the Hill Warranty Club member
Posts: 2,999
Starting to see more light at the end of the tunnel.
Fitting up the engine with hoses and running needed lines. Also have the 3" exhaust to the back of the body.
Sheet metal time for the floor
Fitting up the engine with hoses and running needed lines. Also have the 3" exhaust to the back of the body.
Sheet metal time for the floor